Sprinkler Shutdown Conditions GL5-97

The following conditions apply to a permit to shut down sprinkler protection to all or part of a facility for alterations, additions, repairs, inspections and tests, in accordance with Division B, sentence 6.1.1.3(3) of the AFC 2006.

  1. All new system piping shall be pressure tested in conformance with installation requirements
  2. A main drain test shall be performed to confirm all system valves are open
  3. All alarm and supervisory devices on the system shall be checked to ensure they function as required

Should work on the system be discontinued for any reason prior to completion of the work necessary to ensure full operation, all parts of the system that can be restored to operation will be restored and a fire watch shall be maintained in all areas that remain unprotected.